Wednesday, January 9, 2013

Freight Office Model Update

I may have mentioned somewhere that I am a really, really slow modeler. Even after I take into consideration the non-modeling demands on my time, I can only come to the conclusion that my progress on any given modeling project has to be measured on a geologic time scale.

Over the holidays I did manage to put in a few, ok, several hours on the freight office- and I'm still not done with the one wall I've been working on. So here is a picture in the midst of the sausage making .
My plan is to put as many of the details (including paint) while I can still work on the individual walls as separate pieces as  possible - I have other walls cut out and most of the windows installed by the way but I'm still a  long ways from assembling them together.

That said, I did get the foundation piece under the wall (not trimmed completely yet) and I've extended off to the left where the electrical conduit starts. 

The little bits attached to the walkway are the beginnings of  handrails. The steps going up to the walkway took a verrrry long time. I cut stringers from sheet plastic and then used strips to put the steps in and additional strips to fill in the backs of the steps (the rise). I probably could have built it up faster with sheet plastic. I'm not too worried about the little chip off the bottom of the walkway- there will be quite a bit of sculptamold paving on this side of the building when it is put in the drop in module.

Anyway... hopefully there will be another update on this project before the rurn of the next epoch.

No comments:

Post a Comment