It's
only been 18 months since my last update about/or any work done on the WP 3rd street freight house model. On a geologic time scale, I'm blazing along with blinding speed!
The time spent on the shelf of my cluttered office/man-cave/workshop has taken its toll on the model though. Specifically the delicate handrails on the stairs and deck that lead to the office doors. One wouldn't have needed to be Nostradamus (1503-1566) to predict that any such wear and tear would have worn and torn in that particular area. And since this model is intended for a module (a
drop-in module at that) the decision to fabricate the handrails in ultra small diameter plastic rod was probably pure folly from the start.
So I've broken my R Street modeling fast by attending to rebuilding the handrails, this time in brass. My soldering skills are merely at the neophyte level, so it took me longer then most modelers to fiddle, tack and solder all the brass together and then bend it where needed and then clip and file away the excess solder till it looked half way decent. Still, it was a fun Sunday evening project to while away the hours until the final episode of the second season
Endeavor came on Masterpiece.
I'm hoping it whetted my appetite for more modeling soon. And we can hope this will be 'soon' measured on more of a Julian calendar, something that measures mere weeks rather than epochs and eons.
|
It's a sad state of affairs... the plastic rod, it's not so strong. |
|
Laying things out. |
|
Tacked down and ready for solder... |
|
But maybe not _that_ much solder... |
|
Eventually it cleaned up somewhat. |
No comments:
Post a Comment